Paradise Peak Restart, 60 MW Power & Counsel Execution Room
Built directly inside FTH Trading for Sravan K. Vellanki (Chairman & CEO, Future Tech Holdings), Stephen Braverman, and the Dignity Gold Board. Select who is reviewing below to highlight exact signature documents, plain-English benefits, and an interactive AI walkthrough for each factor.
Choose Your Role to Filter Priorities & Guided Walkthrough
Loading role summary...
Step-by-Step Briefing Across Every Page Section
Loading walkthrough stop...
What Dignity Gold & Its Board Get
What Future Tech Holdings / FTH Trading Gets
Review PDFs, Clear Your Execution Gates & Download SHA-256 Receipts
| Gate | Party & Signer | Exact Document Needed | Stage | Status | Action |
|---|
Recent Deal-Room Sign-Off Receipts (SHA-256 Chained)
| Receipt ID | Gate | Signer & Title | Action | Receipt Hash | Timestamp |
|---|
Download Action Pack Executive PDFs (SHA-256 Verified)
$44.7M–$195M/yr Multi-Layer Revenue Model & Cash-Before-Capital Phasing
Avoid: Pitching as a Standalone Data Center
Use: Mine Reclamation & Industrial Redevelopment
Cash-Before-Capital Execution Sequencing
Interactive NI 43-101 Reserve & 60 MW Surplus Power Calculator
Reconciled Valuation & Power Cash Output
- Combined Gross Au + Ag (In-Place)
- --
- Recoverable Metal (Pre-Cost)
- --
- Pre-Permit Advance Ceiling
- --
- Surface Tailings Gross (9.78M tons)
- --
- Surplus Power Net Operating Income/yr
- --
- Diversegy / UnyKorn Energy Split/yr (60 MW)
- --
60 MW Claim vs 12.5 MW Mill Load
Existing 120 kV subtransmission line, switchyard, and 10 MVA GE substation leave up to 47.5 MW surplus capacity (verified for $0 with NV Energy in Step 5).
NRS 704B Competitive Supply
Active Diversegy Partner ID A10002194 (CJ Peterson) prices competitive wholesale supply and preserves an 80% brokerage annuity across 12–60 month terms.
Modular Powered Pads
Phased 5–47.5 MW hosting pads next to the substation require no building shell and cover mine carry and early engineering costs.
Moving Control Off Single Laptop & Protecting Verified Investors
| Published Supply Bucket | Amount | Plain-English Rule |
|---|
Moving Control Off Stephen’s Laptop (5 Steps)
- Fund ops ETH gas (1.5–2.0 ETH) so emergency compliance calls never stall.
- Deploy a 2-of-3 corporate vault (Stephen hardware key + Board Director + Operator).
- Simulate and transfer admin/pauser roles off the single laptop into the 2-of-3 vault.
- Export executed 2020–2022 investor subscription files (Gate 2B) to separate real holders from bots.
- Sign Dignity Corp Board Control Resolution (Gate 3A) to clear the “control in review” flag.
Clean Post-Production Resolution for Old Holders
- SPV Firewall: Sravan’s new production SPV never inherits 2018 DIG claims or offshore exchange dumpers.
- Voluntary Cash Buyback: Funded post-production from net proceeds; tendered old tokens permanently retired.
- 1-for-1 KYC Upgrade: Verified investors surrender old tokens into escrow to receive audited V2 shares under Board-chosen FINRA BD oversight.
- Exchange Cleanup: Serve delisting notices on Coinstore, Azbit, and XT.com prior to pausing 0x394D14...
$120K–$260K Diligence Schedule & Officer Access Seat Request
| # | Diligence Item | Est. Cost | Scope & Gating Decision |
|---|
Request Additional Principal, Director, or Counsel Seat
Connected FTH Trading Portals (Live Infrastructure)
Technical & Verification Appendix (Open for Unsigned XRPL Case Docket JSON Builder)
Generated Unsigned XRPL Payload
Loading initial XRPL Case NFT payload...